Electrical Commissioning Engineer

AquaTech Pune

AquaTech

Electrical Commissioning Engineer Department: Commissioning

AquaTech Water Industry
Pune
FULL TIME
MID SENIOR (5-10 years)
Diploma

About AquaTech

At Aquatech, we tackle the challenges of water scarcity and complexity by leveraging technology, expertise, and financing to deliver comprehensive solutions that reduce carbon and recycled water footprint. As a leading global provider of water and process technology solutions, we help the world's most recognized companies achieve their sustainability and operational goals by implementing innovative approaches for water reuse, desalination, minimal and zero liquid discharge, and critical minerals recovery. Our work catalyzes the transition toward a more sustainable future and showcases our commitment to addressing water's role in climate adaptation.

51-200 employees

Job Description

ANNEXURE – A

 

Your duties and job responsibilities will include but not be limited to the following:

1.     Commissioning of -

a)     Transformer, PLC panel, MCC panel, VFD panel, UPS and battery

b)    Continuity testing, relay testing, meager testing, hi pot testing of cables, no loads and full load testing of cables.

c)     Instrument installation, termination, calibration and commissioning.

d)    Pre-treatment Systems like Clarifiers, DAF units, Filters etc.

e)     Ion Exchanger units like Cations, Anions, Mixed bed polishers, softeners sequenc test etc.

f)     Membrane based treatment equipment like Reverse Osmosis, Ultra filtration, MBR Systems etc sequence test.

g)    Waste water treatment systems Thickeners, Centrifuge’s, Filter Press, etc

h)    Thermal Evaporators, De-aerators, Heat exchangers, Brine Concentrators etc. MEE/ ATFD

i)      Various Rotating equipments like pumps, blowers, mixers, hot loop test,

 

1)    Plan, co-ordinate and drive Site Activities with Site- Team

2)    Should handle Pre commissioning & commissioning Activities independently.

3)    Report Site Progress, Maintaining the daily log, making various reports like project process for customer as well as office, abnormality reporting etc. Compilation of various documentation required at site.

4)     Meeting the schedule requirements of the project is an important criterion to be adhered.

5)    Maintaining and following site safety requirements.

6)    Commissioning of sites independently, including but not limited to thermal water treatment plants, RO based treatment plants, Resin based Ion Exchange plants etc.

7)    Travelling to various sites for carrying out above activities.


Required Skills

Commissioning
PLCPanel
MCCpanel
VFDpanel
Wastewatertretment
thickeners
centrifuge's
pumps
blowers
Posted 10/3/2025
Updated 10/3/2025
Expires 11/2/2025